Yorba Substation
12kV Switchgear and Control Building Upgrade
Winter 2017 - Fall 2018
This project consists of installation of a new switchgear bank and a new control building. The new control building will control both existing and new switchgear banks. This project also includes the addition of four turning poles, modifications to dead-end structures, prefabricated cable trenches, ductbanks, conduit, conductors, pull boxes, foundations, paving, and fencing.
Project LocationTo see project details click the enlarge icon " [ ] " on the map below:
|
Project Features-New 18 position, 12kV metalclad switchgear.
- New control building. -4 new turning poles Project TeamProject Manager: Roberto Balagtas
Contractor: The Ryan Company (508)-742-2517 City Inspector: Dany Mazraani (714) 231-8373 Funding Sources Electric Bond Funded Capital:
$ 4,755,000.00 |
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.
|
For More Information
To request this in an alternative format please call (714)765-5281 or TTY (714)765-5125. The City prohibits discrimination.
const._notice.2_-_yorba.pdf |