2016-2017 Slurry Seal Group #1
April 2017 - May 2017
The 2016-2017 Slurry Seal Group #1 project will consist of repairs to existing asphalt concrete with slurry seal as well as minor grinding and repaving with new asphalt concrete. The work includes removal and replacement of traffic striping and markings and installation of traffic loops.
Project LocationTo see project details click the enlarge icon " [ ] " on the map below:
|
Project Features
Over 1.7 Miles of Street Repairs
Project TeamProject Manager: Cesar Carillo
Contractor: All American Asphalt (951)-736-7600 City Inspector: Scott Yanagihara (714) 231-4696 Funding SourcesGeneral Fund: $725,000.00
|
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.
|
For More Information
To request this in an alternative format please call (714)765-5281 or TTY (714)765-5125. The City prohibits discrimination.
const._notice.2_revised.pdf |