Electric Reliability System Improvement FY17/18
Various locations in the City of Anaheim
Summer 2018 - Summer 2019
This project consists of installing new conduits and underground structures, cables and transformers to replace degrading direct buried electrical cables; replace deteriorated overhead transformers, wires, cross-arms, and utility poles; and replace existing street light fixtures with LED..
Project LocationTo see project details click the enlarge icon " [ ] " on the map below:
|
Project Features
Project TeamProject Manager: Mary Li
Contractor: Outsource Utility Contractor Corporation (714) 814-5474 City Inspector: Dany Mazraani (714) 765-5176 Funding SourcesLocal Utilities Fund: $5,500,000
|
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.
|
For More Information
To request this in an alternative format please call (714)765-5281 or TTY (714)765-5125. The City prohibits discrimination.