Picture

Cerritos Avenue Sidewalk Gap Closure and Intersection Improvement 

From Euclid to 2310' East of Euclid Street
Fall 2018 - Winter 2018
This project will include the construction of traffic signal modifications; roadway widening; resurfacing the street; replacement of traffic striping, traffic loops, and pavement markings; new sidewalks; ADA access ramps; curb and gutter; replacement of block walls; relocation of driveways; installation of landscaping and irrigation and other miscellaneous items of work.

Project Location

​To see project details click the enlarge icon " [ ] " on the map below:

Project Features

  • New sidewalk and ADA access ramps
  • Replacement of block walls
  • Installation of landscape and irrigation

Project Team

Project Manager: Cesar Carillo
Contractor: HYM Engineering, Inc.
(714) 523-2372
City Inspector: Al Finau
​​(714) 231-6204


Funding Sources

State and Local Funds:
$789,000


Parking

“No-Parking” signs will be posted in advance to restrict parking in construction zones.  Please adhere to the dates and hours on the posted signs.
​

Traffic Consideration

During construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.

For More Information


To request this in an alternative format please call (714)765-5281 or TTY (714)765-5125. The City prohibits discrimination.

Click here to upload file
File Size: 132 kb
File Type: pdf
Download File


Powered by Create your own unique website with customizable templates.