CNG Compressed Natural Gas Detection System Project at Fleet and Facility Services
955 South Melrose, Anaheim, CA 92805
September 2017-December 2017
This project consists installing and making fully functional a system to detect natural gas (also described as “methane” by others) leaks from vehicles inside the repair bays and provide annunciation, control signals and alarms as specified in the specifications and drawings. The project scope also includes providing and installing a new CNG compliant heating system in a portion of existing repair-garage facility.
Project LocationTo see project details click the enlarge icon " [ ] " on the map below:
|
Project Features
Project TeamProject Manager: David Sanchez
Contractor: EFS West City Inspector: Scott Yanagihara Funding Sources
Parksites and Playgrounds Grant $380,000.00
|
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.
|
For More Information
To request this in an alternative format please call (714)765-5281 or TTY (714)765-5125. The City prohibits discrimination.
construction_notice.pdf |