Upgrades to Pressure Regulating Station No. 4 and Pressure Regulating Station No. 6
Orange/Sherril, and Magnolia/Ball
Spring 2018 - Fall 2018
This project consists of replacing existing piping and valves and making electrical and instrumentation upgrades to Pressure Regulating Station No. 4. The project also consists of minor modifications to Pressure Regulating Station No. 6 as well as replacement of aging pipes. This project will improve the water pressure, fire flow, and reliability of the water system.
Project LocationsTo see project details click the enlarge icon " [ ] " on the map below:
|
Project Features
Project TeamProject Manager: Tim Flint
(714) 765-5271 Contractor: T.E. Roberts, Inc. (714) 669-0072 Funding SourcesBond Funded Water Capital:
$575,000.00 |
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.
|