The Work consists of cold planning and resurfacing the roadway with Asphalt Rubber Hot Mix concrete over pavement fabric within the existing right-of-way, removal and reconstruction of ADA access ramp. curb and gutter, concrete sidewalks, adjustment of utility structures and survey monuments, replacement of traffic loops, traffic striping and pavement markings, and all appurtenant work as shown on the plans and delineated in the specification. This rehabilitation will re-establish the pavement structure, restore the surface integrity, improve driving conditions, and improve pedestrian safety on the side walk.
Project Information
See below for project location, latest schedule updates, and other project details:
Project FeaturesRemoval and reconstruction of ADA access ramp, curb and gutter, concrete sidewalks, adjustment of utility structures and survey monuments
|
Funding SourcesM2 Fair Share Fund, SB1 Fund, Wastewater Fund, Water Utility Fund & Electric Utility Fund:
$893,913.45 |
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there may be traffic lane closures; therefore, traffic disruptions shall be expected.
|