Lincoln 16" Water Main
From Beach Blvd to 1250' East of Dale Ave
June 2017 - December 2017
This project will replace old pipes on Lincoln Avenue that have reached the end of their useful life. Approximately 3,900 linear feet of 10-inch cast iron pipe and 16-inch ductile-iron pipe will be installed. The project will improve water pressure and fire flow, as well as improve the water quality and service reliability of the municipal water system.
Project LocationTo see project details click the enlarge icon " [ ] " on the map below:
|
Project Features
Project TeamProject Manager: Dan Setty
Contractor: Ferreira Construction Company Inc. (909) 606-5900 City Inspector: Daryl Lopez (714) 231-8374 Funding SourcesBond Funded Water Capital
$2,300,000 |
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.
|