Picture

Lincoln 16" Water Main

From Beach Blvd to 1250' East of Dale Ave
June 2017 - December 2017
This project will replace old pipes on Lincoln Avenue that have reached the end of their useful life. Approximately 3,900 linear feet of 10-inch cast iron pipe and 16-inch ductile-iron pipe will be installed. The project will improve water pressure and fire flow, as well as improve the water quality and service reliability of the municipal water system.


Project Location

​To see project details click the enlarge icon " [ ] " on the map below:

Project Features

  • Over 3,900 linear feet of new pipes
  • 16 inch ductile-iron pipe
  • 10 inch cast iron pipe

Project Team

Project Manager: Dan Setty
Contractor: Ferreira Construction Company Inc.
(909) 606-5900
City Inspector: Daryl Lopez 
​​(714) 231-8374


Funding Sources

Bond Funded Water Capital
​$2,300,000

Parking

“No-Parking” signs will be posted in advance to restrict parking in construction zones.  Please adhere to the dates and hours on the posted signs.
​

Traffic Consideration

During construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.

For More Information


To request this in an alternative format please call (714)765-5281 or TTY (714)765-5125. The City prohibits discrimination.


const._notice.pdf
File Size: 98 kb
File Type: pdf
Download File


Powered by Create your own unique website with customizable templates.