Katella Water Main
From Disneyland Drive and Haster Street
June 2017 - December 2018
The work to be undertaken consists of replacing approximately 6,450 linear feet of old cast iron pipes with 12 and 16-inch ductile iron and steel pipes. The project will improve water pressure and fire flow, and will help protect and maintain service reliability of the water system.
Project LocationTo see project details click the enlarge icon " [ ] " on the map below:
|
Project Features
Project TeamProject Manager: Bill Moorhead
Contractor: T.E. Roberts Inc (714) 669-0072 City Inspector: Fernando Huizar (714) 231-8373 Funding SourcesBond Funded Water Capital: $7,590,000.00
|
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.
|