Katella Avenue Widening
of the Fourth Eastbound Lane Adjacent to the Convention Center to Hotel Way
The work consists of removing existing hardscape and landscaping, widening and construction an additional travel lane and bus turnout along the Convention Center frontage. This includes removal and reconstruction curb and gutter, fixed, lighted, and retractable bollards, landscaped parkway with trees, concrete sidewalk, concrete sidewalk, concrete pavers, driveways, streetlights, replacement of traffic striping to accommodate the additional travel lone, two fiber optic connected changeable message signs in the median, modifications to a motorized gate .
Project Information
See below for project location, latest schedule updates, and other project details:
Project FeaturesRemoval and reconstruction curb and gutter, fixed, lighted, and retractable bollards, landscaped parkway with trees, concrete sidewalk, concrete pavers, driveways, streetlights, replacement of traffic striping to accommodate the additional travel lane, two fiber optic connected changeable message signs in the median, modifications to a motorized gate.
|
Funding SourcesAnaheim Tourism Improvement, Water, Wastewater & Electric Funds:
$2,149,649.00 |
Parking“No-Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted signs.
|
Traffic ConsiderationDuring construction, there may be traffic lane closures; therefore, traffic disruptions shall be expected.
|