Anaheim Hills Water Main

Anaheim Hills Road from E. Silverspur Trail to Nohl Ranch Road
Summer 2017 - Fall 2018
The work to be undertaken consists of replacing approximately 2,500 feet of existing ductile iron 8-inch pipe with a new 8-inch PVC pipe.  This existing pipeline has experienced past breaks and has been determined vulnerable to further corrosion damage and considered at risk for future failures.  


Project Location

​To see project details click the enlarge icon " [ ] " on the map below:

Project Features

  • Replacing 2,500 feet of old ductile iron 8-inch piping
  • New 8-inch PVC Piping
  • New Reliable pipes​

Project Team

Project Manager: Lisa O'Connell
Contractor: Vido Samarzich, Inc
(909) 987-6377
City Inspector: Brian Moore
​​(714) 765- 4648


Funding Sources

Bonded Funded Water Capital:
​$900,000

Parking

“No-Parking” signs will be posted in advance to restrict parking in construction zones.  Please adhere to the dates and hours on the posted signs.
​

Traffic Consideration

During construction, there will be traffic lane closures; therefore, traffic disruptions shall be expected.

For More Information


To request this in an alternative format please call (714)765-5281 or TTY (714)765-5125. The City prohibits discrimination.